Folks,
Another update ...
We are still waiting on orb integration. Ken is trying his best to get
it done today.
Hudson is showing blue builds as of now and I will request others to
minimize check-ins to reduce the risk of destabilizing the build so we
can create a SCF build as soon as possible.
After SCF, the workspace will be open for fixing any P1-P3 bugs.
Thanks,
Abhijit Kumar wrote:
> Folks,
>
> We are still waiting for following integrations and hence SCF is moved
> to 6 pm pacific on September 1, 2009.
>
> 1. JSR-299 integration, waiting to resolve class loading issues.
> 2. orb integration, waiting to test with a few changes in ejb
> 3. hk2 integration, to resolve domain.xml parsing issues blocking
> upgrade
>
> Thanks,
>
> Abhijit
>