FYI: The maintenance draft review period for our specification (Java EE
Connector Architecture 1.7) has begun. The review period is 30 days
(Feb.14-Mar.18). Please see the MR page at [1].
The specification pdf [2] was updated to reflect the final license and
this copy has been submitted to the JCP.