Skip Headers

Table of Contents Image Oracle Procedural Gateway for APPC Installation and Configuration Guide
Release 9.0.1.0.1 for AIX-Based Systems (64-bit)

Part Number A90849-01
Go To Index
Index

Go to next page

Contents

Title and Copyright Information

Send Us Your Comments

Preface

Intended Audience
Related Documents
Conventions
Documentation Accessibility
Accessibility of Code Examples in Documentation

1 Release Information

Product Set
Changes and Enhancements, Release 9.0.1.0.1
Enhancements
Changes
Known Restrictions

2 Introduction to Oracle Procedural Gateway® for APPC

Overview
Features
Terms
Architecture
Implementation
Starting the Gateway
Communication
Remote Procedural Call Functions
Remote Transaction Initiation
Data Exchange
Remote Transaction Termination
Transaction Types

3 System Requirements

Hardware Requirements
Processor
Memory
Network Attachment
CD-ROM Drive
Disk Space
Software Requirements
Operating System
Communications
Oracle Integrating Server
File Transfer
OLTP
CICS/MVS and CICS/ESA
CICS/VSE
IDMS-DC
IMS/TM
APPC/MVS
Oracle Networking Products
Documentation Requirements

4 Installing and Configuring the Gateway

Before You Begin
Planning to Upgrade the Gateway
Upgrade Considerations
Restoration
Performing Pre-Upgrade Procedures
Performing Pre-Installation Procedures
Installing the Gateway Software
Installation Steps
Step 1: Login as DBA and create login user ID
Step 2: Create the product installation directory
Step 3: Set the ORACLE_HOME environmental variable
Step 4: Verify the ORACLE_TERM environmental variable
Step 5: Mount the CD-ROM
Step 6: Start the Oracle Universal Installer
Step 7: Step through the Oracle Universal Installer
Configuring the Oracle Procedural Gateway for APPC
Pre-Configuration Steps
Oracle Server Coexistent with Gateway Installation/Upgrade
Stand-alone Gateway Installation/Upgrade
Configuring the Oracle Integrating Server for First-Time Installations
Upgrading the Oracle Integrating Server from Previous Releases
First-Time Installation and Upgrade Configuration Steps
Optional Configuration Steps to Permit Multiple Users
AIX Configuration
Configuring the SNA server
Configuring the Gateway
Configuring Your Network
Configuring Two-Phase Commit
Configuring Commit-Confirm
Configuring the OLTP
Configuring CICS/ESA
Configuring IDMS-DC MVS
Configuring IMS/TM
Configuring APPC/MVS
Verifying the Installation
Verifying the Gateway Installation
Verifying the OLTP Configuration
CICS Verification
IDMS-DC Verification
IMS/TM Verification
APPC/MVS Verification
Performing Post-Installation Procedures
Installing Sample Applications
Accessing the Gateway from Other Oracle Servers
Accessing Other OLTPs from the Oracle Integrating Server
De-installing Your Oracle Procedural Gateway for APPC

5 Security Requirements

Overview of Security Requirements
Authenticating Application Logons
Defining and Controlling Database Links
Link Accessibility
Links and CONNECT Clauses
Using SNA Security Validation
Specifying SNA Conversation Security
SNA Security Option SECURITY=NONE
SNA Security Option SECURITY=PROGRAM
SNA Security Option SECURITY=SAME
Processing Inbound Connections

6 SNA Configuration

Independent Versus Dependent LUs
Creating SNA Profiles for the Gateway
Profile Types
SNA Server Profiles
SNA Node Profile
Link Station Profile
Mode Profile
Local LU Profile
Partner LU Profile
Partner LU Location Profile
Side Information Profile
Transaction Program Name Profile
Activating Profiles

7 Implementing Two-Phase Commit

Introduction
Supported OLTPs (Online Transaction Processors)
Two-Phase Commit Architecture
Required Components
Roles of the Components of Two-Phase Commit
Interactions
Two-Phase Commit Flow
Gateway Server and RRM LU6.2 Log Tables
Pre-Configuration Tasks
Choose a Dedicated Local LU
Set Up RRM Execution Group
Configuring Two-Phase Commit
Configuring the Oracle Logging Server
Configuring the Gateway Initialization Parameters
Configuring the RRM Initialization Parameters
Configuring the SNA Server
Configuring CICS/ESA
Post-Configuration Tasks
Set Up RRM Startup and Shutdown Procedures
Customizing the rrmstart script
RRM Recovery
RRM issued message PGA-21215
RRM issued message PGA-21218
Two-Phase Commit With CICS/ESA
Application Design Requirements
Manual Recovery of In-Doubt Transactions
Logging Two-Phase Commit Activity from CICS
PGALUWID Subroutine
Periodic Log Cleanup

8 Migration and Coexistence with Existing Gateways

Migrating An Existing Gateway Instance to New Release
Step 1: Install the new Release
Step 2: Transferring initsid.ora gateway initialization file parameters
Backout Considerations When Migrating to New Releases
New and Changed Parameters: Migrating from Version 4 to Release 9i of the Gateways
New Parameter Added When Migrating from Version 8 or Earlier to Oracle 9i Gateway

A Gateway Initialization Parameters

Gateway Initialization Parameter File
PGA Parameters
PGA_CAPABILITY Parameter Considerations
PGA_CONFIRM Parameter Considerations
Sample pg4hoa1.sh File
Sample initPGA.ora File
Sample rrmstart Script

B AIX - Specific Gateway Messages

Oracle Procedural Gateway for APPC Server Messages
Oracle Procedural Gateway for APPC Resource Recovery Manager Messages

C Summary of Changes in Previous Versions

Changes and Enhancements in Previous Versions
Release 8.0.4.1.0
Release 4.0.1.1.0
Release 4.0.0.1.0
Release 3.4.0.1.0
Release 3.3.1.0.4
Release 3.3.0.0.3
Release 3.2.0
Corrected Problems in Previous Versions
Release 8.0.4.1.0
Release 4.0.1.1.0
Release 4.0.0.1.0
Release 3.4.0.1.0
Release 3.3.0.0.3
Release 3.2.0
Known Problems in Previous Versions
Release 8.0.4.1.0
Release 4.0.1.1.0

Index


Go to next page
Oracle
Copyright © 2001 Oracle Corporation.

All Rights Reserved. | | Ad Choices.
Go To Index
Index