Page[1]=new Array("This guide details how data is mapped between P6 EPPM and Microsoft Project XML format. Throughout this guide, the term P6 EPPM includes P6 Professional. Any content that applies to only one of these applications is labeled accordingly.","All users who want to exchange data between P6 EPPM and other systems using Microsoft Project XML format should use this document.","Note","All project-level calendars and any global calendars assigned to activities are exported to Microsoft Project as Working Time Calendars.<br />Working Time Calendars in Microsoft Project are imported into P6 EPPM as project-level calendars. ","Calendars assigned to resources are exported to Microsoft Project as Resource Working Time Calendars.<br />Resource Working Time calendars in Microsoft Project are imported into P6 EPPM as resource-level calendars.","P6 EPPM and P6 Professional use different data structures from Microsoft Project, so some information may be lost during the import and export process. Also P6 EPPM and P6 Professional use slightly different calculations for units and costs from Microsoft Project, so these values might not be identical when a project is imported or exported to Microsoft Projects. Refer to the P6 EPPM Importing and Exporting Guide for further considerations.","Caution Personal information (PI) may be at risk of exposure. Depending on local data protection laws organizations may be responsible for mitigating any risk of exposure.","About This Guide","97782.htm");
Page[2]=new Array("P6 EPPM Field","P6 EPPM Table Field","P6 EPPM Table","Microsoft Project Field","Currency Symbol","curr_symbol","CURRTYPE","Symbol","Positive Currency Format","pos_curr_fmt_type","CURRTYPE","Placement","Number of Decimal Places","decimal_digit_cnt","CURRTYPE","Decimal Digits","View Tab","97699.htm");
Page[3]=new Array("P6 EPPM Field","P6 EPPM Table Field","P6 EPPM Table","Microsoft Project Field","Durations Format Unit of Time","user_data","USERDATA","Duration is entered in","Default Duration Type","See duration type sub-table.","def_duration_type","Project","Default Task Type","Units Format Unit of Time","user_data","USERDATA","Work is entered in","Units per Time format","user_data","USERDATA","Show Assignment Units as a","Duration Type Sub-table","P6 EPPM Field","Microsoft Project Field","Fixed Duration and Units/Time","Fixed Duration","Fixed Duration and Units","Fixed Duration","Fixed Units/Time","Fixed Units","Fixed Units","Fixed Work","Schedule Tab","97750.htm");
Page[4]=new Array("P6 EPPM Field","P6 EPPM Table Field","P6 EPPM Table","Microsoft Project Field","Work Hours Per Day","day_hr_cnt","PREFER","Hours per day","Work Hours Per Week","week_hr_cnt","PREFER","Hours per week","Fiscal Year Begins","fy_start_month_num","PROJECT","Fiscal year starts in","Calendar Tab","97751.htm");
Page[5]=new Array("P6 EPPM Field","P6 EPPM Table Field","P6 EPPM Table","Microsoft Project Field","Critical Activities","critical_drtn_hr_cnt","PROJECT","Tasks are critical if slack is less than or equal to _ days","Note The currency settings exported are based on the currency selected in the User Preferences, Currency tab in P6 EPPM.","Calculation Tab","97752.htm");
Page[6]=new Array("P6 EPPM Field","P6 EPPM Table Field","P6 EPPM Table","Microsoft Project Field","Project Name/WBS Name","wbs_name","PROJWBS","Title","Notebook Description","wbs_memo","WBSMEMO","Comments","User Defined Field Title","User Defined Field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Manager","User Defined Field Title","User Defined Field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Subject","User Defined Field Title","User Defined Field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Category","User Defined Field Title","User Defined Field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Keywords","Project Properties","97943.htm");
Page[7]=new Array("P6 EPPM Field","P6 EPPM Table Field","P6 EPPM Table","Microsoft Project Field","Default Project Calendar","clndr_id","PROJECT","Calendar","Data Date","data_date","PROJECT","Start date and Status date","Project Leveling Priority","priority_num","PROJECT","Priority","n/a","Defaults to Project Start Date","n/a","Schedule from","n/a","Calculated by Microsoft Project","n/a","Current Date","Calculated by Microsoft Project","Project Information","97944.htm");
Page[8]=new Array("P6 EPPM Field","P6 EPPM Table Field","P6 EPPM Table","Microsoft Project Field","n/a","auto-generated by Microsoft Project","n/a","ID","Resource Name","rsrc_name","RSRC","Name","Resource ID","rsrc_short_name","RSRC","Initials","Max Units/Time","max_qty_per_hr","RSRC","Max Units","Price/Unit ","cost_per_qty","RSRC","Standard Rate","Price/Unit*Overtime Factor","cost_per_qty*ot_factor","RSRC","Overtime Rate","Resource Name (of parent)","rsrc_name (of parent)","RSRC","Group","E-Mail Address","email_addr","RSRC","Email Address","Resource Type (labor, equipment, material)","rsrc_type","RSRC","Type","(work= labor or equipment,<br />material = material)","Unit of Measure","unit_abbrev","UMEASURE","Material Labor","Units &amp; Prices","See units and prices sub-table.","start_date<br />cost_per_qty<br />cost_per_qty2<br />cost_per_qty3<br />cost_per_qty4<br />cost_per_qty5","RSRCRATE","Cost Rate Tables","Resource Notes","rsrc_notes","RSRC","Note","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Text1 &#8211; Text30","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Cost1 &#8211; Cost10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Date1 &#8211; Date10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Duration1 &#8211; Duration10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Number1 &#8211; Number20","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Start1 &#8211; Start10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Finish1 &#8211; Finish10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Flag1 &#8211; Flag20","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Baseline Cost1 &#8211; Baseline Cost10","(Microsoft Project 2002 and later)","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Baseline Work1 &#8211; Baseline Work10","(Microsoft Project 2002 and later)","Units and Prices Sub-table","P6 EPPM Field","Microsoft Project Field","Effective Date","Effective Date","Price/Unit 1","Standard Rate A","Price/Unit 2","Standard Rate B","Price/Unit 3","Standard Rate C","Price/Unit 4","Standard Rate D","Price/Unit 5","Standard Rate E","Resource","97945.htm");
Page[9]=new Array("P6 EPPM Field","P6 EPPM Table Field","P6 EPPM Table","Microsoft Project Field","n/a","auto-generated by Microsoft Project","n/a","ID","Activity Name","task_name","TASK","Name","WBS Code","wbs_short_name","PROJWBS","WBS","n/a","calculated on export","n/a","Outline Level","Primary Constraint","See constraint sub-table.","cstr_type","TASK","Constraint Type","Primary Constraint Date","cstr_date","TASK","Constraint Date","Activity Leveling Priority","See activity leveling priority sub-table.","priority_type","TASK","Priority","Activity Type","See activity type sub-table. ","task_type","TASK","Task or Milestone","At Completion Duration","total_drtn_hr_cnt","TASK","Duration","Planned Duration (P6 EPPM)","Original Duration or Planned Duration (P6 Professional)","target_drtn_hr_cnt","TASK","Baseline Duration","Actual Duration","act_drtn_hr_cnt","TASK","Actual Duration","Remaining Duration","remain_drtn_hr_cnt","TASK","Remaining Duration","Duration Type","See duration type sub-table. ","duration_type","TASK","Task Type","Predecessors","n/a","TASKPRED","Predecessors","Start","start_date","TASK","Start","Finish","end_date","TASK","Finish","Early Start","early_start_date","TASK","Early Start","Early Finish","early_end_date","TASK","Early Finish","Late Start","late_start_date","TASK","Late Start","Late Finish","late_end_date","TASK","Late Finish","Planned Start","target_start_date","TASK","Baseline Start","Planned Finish","target_end_date","TASK","Baseline Finish","Actual Start","act_start_date","TASK","Actual Start","Actual Finish","act_end_date","TASK","Actual Finish","At Completion Labor Units","total_work_qty","TASK","Work","Planned Labor Units (P6 EPPM)","Budgeted Labor Units or Planned Labor Units (P6 Professional)","target_work_qty","TASK","Baseline Work","Actual Labor Units","act_work_qty","TASK","Actual Work","Estimate At Completion Cost","(actual cost + estimate to complete cost)","EAC","TASK","Cost","At Completion Expense Cost","total_expense_cost","TASK","Fixed Cost","Budget At Completion","(planned labor cost + planned nonlabor cost + planned expense cost in P6 EPPM)","(budgeted or planned labor cost + budgeted or planned nonlabor cost + budgeted or planned expense cost in P6 Professional)","BAC","TASK","Baseline Cost","Accrual Type ","See accrual type sub-table.","cost_load_type","PROJCOST","Fixed Cost Accrual","Activity Calendars","clndr_id (foreign key)","TASK","Task Calendar","Expected Finish ","expect_end_date","TASK","Deadline ","(Microsoft Project 2000 and later)","Physical % Complete ","phys_complete_pct","TASK","Physical % Complete ","(Microsoft Project 2002 and later)","Estimate To Complete (Remaining labor, nonlabor, and expense cost)","ETC","TASK","Remaining Cost","Notebook Description","task_memo","TASKMEMO","Note","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Text1-Text30","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Cost1&#8211;Cost10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Duration1-Duration10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Start1-Start10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Finish1-Finish10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Flag1-Flag20","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Number1-Number20","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Date1 &#8211; Date10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Baseline Cost1 &#8211; Baseline Cost10","(Microsoft Project 2002 and later)","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Baseline Duration1 &#8211; Baseline Duration10","(Microsoft Project 2002 and later)","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Baseline Work1 &#8211; Baseline Work10","(Microsoft Project 2002 and later)","User Defined Field Title","User defined field","(The Activity ID Setting applies when you are updating an existing imported project.)","UDFVALUE","Activity ID","Constraint Sub-table","P6 EPPM Field","Microsoft Project Field","Start on","Must start on","Start on or before","Start no later than","Start on or after","Start no earlier than","Mandatory Start","Must start on","Finish on","Must finish on","Finish on or after","Finish no earlier than","Finish on or before","Finish no later than","Mandatory Finish","Must finish on","As late as possible","As late as possible","Activities without constraints","As soon as possible","Activity Leveling Priority sub-table","P6 EPPM Field","Microsoft Project Field","Top","Highest","High","Higher","Medium","Medium","Low","Lower","Lowest","Lowest","Activity Type Sub-table","P6 EPPM Field","Microsoft Project Field","Task Dependent","Task - Scheduling Ignores Resource Calendars is selected ","(Microsoft Project 2000 and later)","Resource Dependent ","Task - Scheduling Ignores Resource Calendars is not selected ","(Microsoft Project 2000 or later)","Start Milestone","Milestone - Mark Task as Milestone is selected","Finish Milestone","Milestone - Mark Task as Milestone is selected","Level of Effort","Task - Scheduling Ignores Resource Calendars is not selected ","(Microsoft Project 2000 and later) ","Duration Type Sub-table","P6 EPPM Field","Microsoft Project Field","Fixed Duration and Units/Time","Fixed Duration (Effort Driven No)","Fixed Units/Time","Fixed Units (Effort Driven Yes)","Fixed Units","Fixed Work (Effort Driven No)","Fixed Duration and Units ","Fixed Duration (Effort Driven Yes)","Fixed Units/Time","Fixed Units (Effort Driven No)","Accrual Type Sub-table","P6 EPPM Field","Microsoft Project Field","Start of Activity","Start","Uniform over Activity","Prorated","Finish of Activity","End","Task","97946.htm");
Page[10]=new Array("P6 EPPM Field","P6 EPPM Table Field","P6 EPPM Table","Microsoft Project Field","Planned Units/Time (P6 EPPM)","Budgeted Units/Time or Planned Units/Time (P6 Professional)","target_qty_per_hr","TASKRSRC","Units","At Completion Units","total_qty","TASKRSRC","Work","Planned Units (P6 EPPM)","Budgeted Units or Planned Units (P6 Professional)","target_qty","TASKRSRC","Planned Work","Actual Regular Units","act_reg_qty","TASKRSRC","Actual Work","Actual Overtime Units","act_ot_qty","TASKRSRC","Actual Overtime Work","At Completion Cost","total_cost","TASKRSRC","Cost","Planned Cost (P6 EPPM)","Budgeted Cost or Planned Cost (P6 Professional)","target_cost","TASKRSRC","Planned Cost","Actual Cost","act_cost","TASKRSRC","Actual Cost","Lag","lag_drtn_hr_cnt","TASKRSRC","Assignment Delay","Resource Curve","See resource curve sub-table.","curv_id (foreign key)","TASKRSRC","Work Contour","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Note","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Cost1 &#8211; Cost10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Date1 &#8211; Date10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Duration1 &#8211; Duration10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Start1 &#8211; Start10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Finish1 &#8211; Finish10","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Text1 &#8211; Text30","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Flag1 &#8211; Flag20","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Baseline Cost1 &#8211; Baseline Cost10 ","(Microsoft Project 2002 and later)","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Baseline Work1 &#8211; Baseline Work10","(Microsoft Project 2002 and later)","User Defined Field Title","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","Number1 &#8211; Number20","Resource Curve Sub-table","P6 EPPM Field","Microsoft Project Field","Linear","Flat","Triangular Increase","Back Loaded","Triangular Decrease","Front Loaded","Double Peak","Double Peak","Early Peak","Early Peak","Offset Triangular","Late Peak","Bell Shaped","Bell","Trapezoidal","Turtle","All other curve types (including Manual)","Contoured","Resource Assignments","97947.htm");
Page[11]=new Array("Microsoft Project Field","P6 EPPM Table Field","P6 EPPM Table","P6 EPPM Field","Default Task Type","See default type sub-table.","def_duration_type","PROJECT ","Default Duration","Default Task Type Sub-table","Microsoft Project Field","P6 EPPM Field","Fixed Duration","Fixed Duration and Units/Time","Fixed Units","Fixed Units/Time","Fixed Work","Fixed Units","Schedule Tab","97951.htm");
Page[12]=new Array("Microsoft Project Field","P6 EPPM Table Field","P6 EPPM Table","P6 EPPM Field","Fiscal year starts in ","fy_start_month_num","PROJECT","Fiscal Year Begins","Hours Per Day","day_hr_cnt","CALENDAR","Work Hours Per Day","Hours Per Week","week_hr_cnt","CALENDAR","Work Hours Per Week","Note","Calendars in P6 EPPM additionally have settings for Work Hours Per Month and Work Hours Per Year. Microsoft Project does not have equivalent fields. To calculate Work Hours Per Month, P6 EPPM applies the following formula: Days Per Month (as defined in Microsoft Project) multiplied by Hours Per Day. Using the value derived from this calculation, P6 EPPM applies the following formula to calculate Work Hours per Year: Work Hours per Month multiplied by 12.","Calendar hours per timeperiod settings in Microsoft Project are only imported if the Use assigned calendar to specify the number of work hours for each time period option is selected on the time periods page of application settings in P6 EPPM or the time periods page of admin preferences in P6 Professional.","Working time calendars in Microsoft Project are imported as project-level calendars. Resource working time calendars in Microsoft Project are imported as resource-level calendars.","Calendar Tab","97952.htm");
Page[13]=new Array("Microsoft Project Field","P6 EPPM Table Field","P6 EPPM Table","P6 EPPM Field","Tasks are critical if slack is less than or equal to __ days ","critical_drtn_hr_cnt","PROJECT","Critical Activities","Calculation tab","97953.htm");
Page[14]=new Array("Microsoft Project Field","P6 EPPM Table Field","P6 EPPM Table","P6 EPPM Field","Title","wbs_name","PROJWBS","Project Name/WBS Name","Comments","wbs_memo","WBSMEMO","Notebook Description","Manager","User Defined Field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Subject","User Defined Field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Category","User Defined Field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Keywords","User Defined Field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Project Properties","97766.htm");
Page[15]=new Array("Microsoft Project Field","P6 EPPM Table Field","P6 EPPM Table","P6 EPPM Field","Calendar","clndr_id","PROJECT","Default Project Calendar","Start Date","data_date<br />plan_start_date","PROJECT","Data Date and Planned Start","Priority","priority_num","PROJECT","Project Leveling Priority","Finish date","(Calculated by Microsoft Project.)","plan_end_date","PROJECT","Must Finish By","Project Information","97767.htm");
Page[16]=new Array("Microsoft Project Field","P6 EPPM Table Field","P6 EPPM Table","P6 EPPM Field","Name","rsrc_name","RSRC","Resource Name","Resource Initials or <br />Resource Name","rsrc_short_name","RSRC","Resource ID","Max Units","max_qty_per_hr","RSRC","Max Units/Time","Standard Rate","cost_per_qty","RSRC","Price/Unit","Overtime Rate","cost_per_qty multiplied by ot_factor","RSRC","Price/Unit multiplied by Overtime Factor","Group","rsrc_name(of parent)","RSRC","Resource Name (of parent)","Email Address","email_addr","RSRC","Email Address","Type (work = labor, material = material)","rsrc_type","RSRC","Resource Type (labor, equipment, material)","Material Labor","unit_abbrev","UMEASURE","Unit of Measure","Cost Rate Tables","See cost rate sub-table.","start_date<br />cost_per_qty<br />cost_per_qty2<br />cost_per_qty3<br />cost_per_qty4<br />cost_per_qty5","RSRCRATE","Units &amp; Prices","Note","rsrc_notes","RSRC","Resource Notes","Text1-Text30","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Cost1-Cost10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Date1-Date10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Duration1-Duration1","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Number1-Number20","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Start1-Start10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Finish1-Finish10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Flag1-Flag20","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Baseline Cost1-<br />Baseline Cost10<br />(Microsoft Project 2002 and later)","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Baseline Work1-<br />Baseline Work10<br />(Microsoft Project 2002)","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Cost Rate Sub-table","Microsoft Project Field","P6 EPPM Field","Effective Date","Effective Date","Standard Rate A","Price/Unit 1","Standard Rate B","Price/Unit 2","Standard Rate C","Price/Unit 3","Standard Rate D","Price/Unit 4","Standard Rate E","Price/Unit 5","Resource","97768.htm");
Page[17]=new Array("Microsoft Project Field","P6 EPPM Table Field","P6 EPPM Table","P6 EPPM Field","ID","auto-increment or Microsoft Project ID","TASK","Activity ID","Name","task_name","TASK","Activity Name","WBS","wbs_short_name","PROJWBS","WBS Code","Outline Level","builds the WBS structure","n/a","n/a","Constraint Type","See constraint type sub-table.","cstr_type","TASK","Primary Constraint","Constraint Date","cstr_date","TASK","Primary Constraint Date","Priority","See activity leveling priority sub-table.","priority_type","TASK","Activity Leveling Priority","Task or Milestone","See activity type sub-table. ","task_type","TASK","Activity Type","Duration","total_drtn_hr_cnt","TASK","At Completion Duration","Baseline Duration","target_drtn_hr_cnt","TASK","Planned Duration (P6 EPPM)","Original Duration or Planned Duration (P6 Professional)","Actual Duration","act_drtn_hr_cnt","TASK","Actual Duration","Remaining Duration","remain_drtn_hr_cnt","TASK","Remaining Duration","Task Type","See duration type sub-table. ","duration_type","TASK","Duration Type","Predecessors","n/a","TASKPRED","Predecessors","Start","start_date","TASK","Start","Finish","end_date","TASK","Finish","Early Start","early_start_date","TASK","Early Start","Early Finish","early_end_date","TASK","Early Finsih","Late Start","late_start_date","TASK","Late Start","Late Finish","late_end_date","TASK","Late Finish","Baseline Start","target_start_date","TASK","Planned Start","Baseline Finish","target_end_date","TASK","Planned Finish","Actual Start","act_start_date","TASK","Actual Start","Actual Finish","act_end_date","TASK","Actual Finish","Work","total_work_qty","TASK","At Completion Labor Units","Baseline Work","target_work_qty","TASK","Planned Labor Units (P6 EPPM)","Budgeted Labor Units or Planned Labor Units (P6 Professional)","Actual Work","act_work_qty","TASK","Actual Labor Units","Cost","EAC","TASK","Estimate At Completion Cost<br />(actual cost + estimate to complete cost)","Fixed Cost","total_expense_cost","TASK","At Completion Expense Cost","Baseline Cost","BAC","TASK","Budget At Completion","(planned labor cost + planned nonlabor cost + planned expense cost in P6 EPPM)","(budgeted or planned labor cost + budgeted or planned nonlabor cost + budgeted or planned expense cost in P6 Professional)","Actual Cost","ACWP","TASK","Actual Cost (actual labor, nonlabor, and expense cost)","Fixed Cost Accrual","See accrual type sub-table","cost_load_type","PROJCOST","Accrual Type","Task Calendar","clndr_id (foreign key)","TASK","Activity Calendars","Deadline","(Microsoft Project 2000 and later)","expect_end_date","TASK","Expected Finish","Physical % Complete<br />(Microsoft Project 2002 and later)","phys_complete_pct","TASK","Physical % Complete","Remaining Cost","ETC","TASK","Estimate To Complete <br />(Remaining labor, nonlabor, and expense cost)","Note","task_memo","TASKMEMO","Notebook Description","Text1-Text30","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Cost1-Cost10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Duration1-Duration10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Start1-Start10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Finish1-Finish10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Flag1-Flag20","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Number1-Number20","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Date1-Date10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Baseline Cost1-Baseline Cost10","(Microsoft Project 2002 and later)","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Baseline Duration 1-Baseline Duration10","(Microsoft Project 2002 and later)","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Baseline Work1-Baseilne Work10","(Microsoft Project 2002 and later)","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Activity ID","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Constraint Sub-table","Microsoft Project Field","P6 EPPM Field","Must start on","Mandatory Start","Start no later than","Start on or before","Start no earlier than","Start on or after","Must finish on","Mandatory Finish","Finish no earlier than","Finish on or after","Finish no later than","Finish on or before","As late as possible","As late as possible","As soon as possible","Activities without constraints","Activity Leveling Priority Sub-table","Microsoft Project Field","P6 EPPM Field","Highest","Top","Higher","High","Medium","Medium","Lower","Low","Lowest","Lowest","Activity Type Sub-table","Microsoft Project Field","P6 EPPM Field","Task - Scheduling Ignores Resource Calendars is selected","(Microsoft Project 2000 and later)","Task Dependent","Task - Scheduling Ignores Resource Calendars is not selected","(Microsoft Project 2000 and later)","Resource Dependent","Milestone - Mark Task as Milestone is selected ","Task imported as a Start Milestone","Duration Type Sub-table","Microsoft Project Field","P6 EPPM Field","Fixed Duration (Effort Driven No)","Fixed Duration and Units/Time","Fixed Units (Effort Driven Yes)","Fixed Units/Time","Fixed Work (Effort Driven No)","Fixed Units","Fixed Duration (Effort Driven Yes)","Fixed Duration and Units","Fixed Units (Effort Driven No)","Fixed Units/Time","Accrual Type Sub-table","Microsoft Project Field","P6 EPPM Field","Start","Start of Activity","Prorated","Uniform over Activity","End","Finish of Activity","Task","97776.htm");
Page[18]=new Array("Microsoft Project Field","P6 EPPM Table Field","P6 EPPM Table","P6 EPPM Field","Units","target_qty_per_hr","TASKRSRC","Budgeted/Planned Units/Time","Work","total_qty","TASKRSRC","At Completion Units","Planned Work","target_qty","TASKRSRC","Budgeted/Planned Units","Actual Work","act_reg_qty","TASKRSRC","Actual Regular Units","Actual Overtime Work ","act_ot_qty","TASKRSRC","Actual Overtime Units","Cost ","total_cost","TASKRSRC","At Completion Cost","Planned Cost ","target_cost","TASKRSRC","Planned Cost (P6 EPPM)","Budgeted Cost or Planned Cost (P6 Professional)","Actual Cost","act_cost","TASKRSRC","Actual Cost","Assignment Delay ","lag_drtn_hr_cnt","TASKRSRC","Lag","Work Contour ","See resource curve sub-table.","curv_id (foreign key)","TASKRSRC","Resource Curve","Note","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Cost1 &#8211; Cost10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Date1 &#8211; Date10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Duration1 &#8211; Duration10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Start1 &#8211; Start10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Finish1 &#8211; Finish10","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Text1 &#8211; Text30","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Flag1 &#8211; Flag20","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Baseline Cost1 &#8211; Baseline Cost10 ","(Microsoft Project 2002 and later)","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Baseline Work1 &#8211; Baseline Work10","(Microsoft Project 2002 and later)","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Number1 &#8211; Number20","User defined field","(Exchanged only if a mapping is defined for the field.)","UDFVALUE","User Defined Field Title","Resource Curve Sub-table","Microsoft Project Field","P6 EPPM Field","Flat","Linear","Back Loaded ","Triangular Increase","Front Loaded","Triangular Decrease","Double Peak","Double Peak","Early Peak","Early Peak","Late Peak","Offset Triangular","Bell","Bell Shaped","Turtle","Trapezoidal","Contoured ","Manual","Resource Assignments","97956.htm");
var PageCount=19;


/*
Date: 12/9/2025 1:52 PM
Source: EPPM_25_dev
BookID: 97551
PubProduct: PRIMAVERA_EPPM
BookTitle: Microsoft Project Import/Export Data Map Guide (XML)
Version: Version 25
Lang:	en
*/