Interface WBSSpreadPeriod
- All Superinterfaces:
SpreadPeriod
- All Known Subinterfaces:
EPSSpreadPeriod,ProjectSpreadPeriod
This interface defines all access methods for each WBS spread period. The spread period is
calculated according to the bucket type.
-
Method Summary
Modifier and TypeMethodDescriptionGets the actual cost for this spread period.Gets the actual expense cost for this spread period.Gets the actual labor cost for this spread period.Gets the actual labor units for this spread period.Gets the actual material cost for this spread period.Gets the actual nonlabor cost for this spread period.Gets the actual nonlabor units for this spread period.Gets the actual total cost, including labor, nonlabor, and expense cost, for this spread period.Gets the at completion expense cost for this spread period.Gets the at completion labor cost for this spread period.Gets the at completion labor units for this spread period.Gets the at completion material cost for this spread period.Gets the at completion nonlabor cost for this spread period.Gets the at completion nonlabor units for this spread period.Gets the at completion total cost for this spread period.Gets the baseline planned expense cost for this spread period.Gets the baseline planned labor cost for this spread period.Gets the baseline planned labor units for this spread period.Gets the baseline planned material cost for this spread period.Gets the baseline planned nonlabor cost for this spread period.Gets the baseline planned nonlabor units for this spread period.Gets the baseline planned total cost for this spread period.Gets the cumulative actual cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative actual expense cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative actual labor cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative actual labor units for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative actual material cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative actual nonlabor cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative actual nonlabor units for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative actual total cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative at completion expense cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative at completion labor cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative at completion labor units for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative at completion material cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative at completion nonlabor cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative at completion nonlabor units for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative at completion total cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative baseline planned expense cost for this spread period, which is cumulated from the baseline planned start to the end of this period.Gets the cumulative baseline planned labor cost for this spread period, which is cumulated from the baseline planned start to the end of this period.Gets the cumulative baseline planned labor units for this spread period, which is cumulated from the baseline planned start to the end of this period.Gets the cumulative baseline planned material cost for this spread period, which is cumulated from the baseline planned start to the end of this period.Gets the cumulative baseline planned nonlabor cost for this spread period, which is cumulated from the baseline planned start to the end of this period.Gets the cumulative baseline planned nonlabor units for this spread period, which is cumulated from the baseline planned start to the end of this period.Gets the cumulative baseline planned total cost for this spread period, which is cumulated from the baseline planned start to the end of this period.Gets the cumulative earned value cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative earned value labor units for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative estimate at completion cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative estimate at completion labor cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative estimate to complete labor cost for this spread period, which is cumulated from the remaining start to the end of this period.Gets the cumulative estimate to complete labor units for this spread period, which is cumulated from the remaining start to the end of this period.Gets the cumulative financial period actual expense cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period actual labor cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period actual labor units for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period actual material cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period actual nonlabor cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period actual nonlabor units for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period actual total cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period at completion expense cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period at completion labor cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period at completion labor units for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period at completion material cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period at completion nonlabor cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period at completion nonlabor units for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period at completion total cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period earned value cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period earned value labor units for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period estimate at completion cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period estimate at completion labor cost for this spread period, which is cumulated from the actual start to the end of this period.Gets the cumulative financial period planned value cost for this spread period, which is cumulated from the baseline planned start to the end of this period.Gets the cumulative financial period planned value labor units for this spread period, which is cumulated from the baseline planned start to the end of this period.Gets the cumulative planned expense cost for this spread period, which is cumulated from the planned start to the end of this period.Gets the cumulative planned labor cost for this spread period, which is cumulated from the planned start to the end of this period.Gets the cumulative planned labor units for this spread period, which is cumulated from the planned start to the end of this period.Gets the cumulative planned material cost for this spread period, which is cumulated from the planned start to the end of this period.Gets the cumulative planned nonlabor cost for this spread period, which is cumulated from the planned start to the end of this period.Gets the cumulative planned nonlabor units for this spread period, which is cumulated from the planned start to the end of this period.Gets the cumulative planned total cost for this spread period, which is cumulated from the planned start to the end of this period.Gets the cumulative planned value cost for this spread period, which is cumulated from the baseline planned start to the end of this period.Gets the cumulative planned value labor units for this spread period, which is cumulated from the baseline planned start to the end of this period.Gets the cumulative remaining expense cost for this spread period, which is cumulated from the remaining start to the end of this period.Gets the cumulative remaining labor cost for this spread period, which is cumulated from the remaining start to the end of this period.Gets the cumulative remaining labor units for this spread period, which is cumulated from the remaining start to the end of this period.Gets the cumulative remaining late expense cost for this spread period, which is cumulated from the remaining late start to the late end of this period.Gets the cumulative remaining late labor cost for this spread period, which is cumulated from the remaining late start to the late end of this period.Gets the cumulative remaining late labor units for this spread period, which is cumulated from the remaining late start to the late end of this period.Gets the cumulative remaining late material cost for this spread period, which is cumulated from the remaining late start to the late end of this period.Gets the cumulative remaining late nonlabor cost for this spread period, which is cumulated from the remaining late start to the late end of this period.Gets the cumulative remaining late nonlabor units for this spread period, which is cumulated from the remaining late start to the late end of this period.Gets the cumulative remaining late total cost for this spread period, which is cumulated from the remaining late start to the late end of this period.Gets the cumulative remaining material cost for this spread period, which is cumulated from the remaining start to the end of this period.Gets the cumulative remaining nonlabor cost for this spread period, which is cumulated from the remaining start to the end of this period.Gets the cumulative remaining nonlabor units for this spread period, which is cumulated from the remaining start to the end of this period.Gets the cumulative remaining total cost for this spread period, which is cumulated from the remaining start to the end of this period.Gets the earned value cost for this spread period.Gets the earned value labor units for this spread period.Gets the estimate at completion cost for this spread period.Gets the estimate at completion labor cost for this spread period.Gets the estimate to complete labor cost for this spread period.Gets the estimate to complete labor units for this spread period.Gets the financial period actual expense cost for this spread period.Gets the financial period actual labor cost for this spread period.Gets the financial period actual labor units.Gets the financial period actual material cost for this spread period.Gets the financial period actual nonlabor cost for this spread period.Gets the financial period actual nonlabor units for this spread period.Gets the financial period actual total cost, including labor, nonlabor, and expense cost, for this spread period.Gets the financial period at completion expense cost for this spread period.Gets the financial period at completion labor cost for this spread period.Gets the financial period at completion labor units for this spread period.Gets the financial period at completion material cost for this spread period.Gets the financial period at completion nonlabor cost for this spread period.Gets the financial period at completion nonlabor units for this spread period.Gets the financial period at completion total cost for this spread period.Gets the financial period earned value cost for this spread period.Gets the financial period earned value labor units for this spread period.Gets the financial period estimate at completion cost for this spread period.Gets the financial period estimate at completion labor cost for this spread period.Gets the financial period planned value cost for this spread period.Gets the financial period planned value labor units for this spread period.Gets the planned expense cost for this spread period.Gets the planned labor cost for this spread period.Gets the planned labor units for this spread period.Gets the planned material cost for this spread period.Gets the planned nonlabor cost for this spread period.Gets the planned nonlabor units for this spread period.Gets the planned total cost for this spread period.Gets the planned value cost for this spread period.Gets the planned value labor units for this spread period.Gets the remaining expense cost for this spread period.Gets the remaining labor cost for this spread period.Gets the remaining labor units for this spread period.Gets the remaining late expense cost for this spread period.Gets the remaining Late labor cost for this spread period.Gets the remaining late labor units for this spread period.Gets the remaining late material cost for this spread period.Gets the remaining late nonlabor cost for this spread period.Gets the remaining late nonlabor units for this spread period.Gets the remaining late total cost for this spread period.Gets the remaining material cost for this spread period.Gets the remaining nonlabor cost for this spread period.Gets the remaining nonlabor units for this spread period.Gets the remaining total cost for this spread period.Methods inherited from interface com.primavera.common.value.spread.SpreadPeriod
getCost, getCumulativeCost, getCumulativeUnits, getSpreadBucketType, getSpreadBucketTypeEnum, getSpreadPeriodEnd, getSpreadPeriodStart, getUnits, setCost, setUnits
-
Method Details
-
getActualLaborUnits
Gets the actual labor units for this spread period.- Returns:
- the actual labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeActualLaborUnits
Unit getCumulativeActualLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative actual labor units for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated actual labor units in hours.
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getActualNonlaborUnits
Gets the actual nonlabor units for this spread period.- Returns:
- the actual nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeActualNonlaborUnits
Unit getCumulativeActualNonlaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative actual nonlabor units for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated actual nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getAtCompletionLaborUnits
Gets the at completion labor units for this spread period.- Returns:
- the at completion labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeAtCompletionLaborUnits
Unit getCumulativeAtCompletionLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative at completion labor units for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated at completion labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getAtCompletionNonlaborUnits
Gets the at completion nonlabor units for this spread period.- Returns:
- the at completion nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeAtCompletionNonlaborUnits
Unit getCumulativeAtCompletionNonlaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative at completion nonlabor units for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated at completion nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getBaselinePlannedLaborUnits
Gets the baseline planned labor units for this spread period.- Returns:
- the baseline labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeBaselinePlannedLaborUnits
Unit getCumulativeBaselinePlannedLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative baseline planned labor units for this spread period, which is cumulated from the baseline planned start to the end of this period.- Returns:
- the cumulated baseline planned labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getBaselinePlannedNonlaborUnits
Gets the baseline planned nonlabor units for this spread period.- Returns:
- the baseline planned nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeBaselinePlannedNonlaborUnits
Unit getCumulativeBaselinePlannedNonlaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative baseline planned nonlabor units for this spread period, which is cumulated from the baseline planned start to the end of this period.- Returns:
- the cumulated baseline planned nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingLaborUnits
Gets the remaining labor units for this spread period.- Returns:
- the remaining labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingLaborUnits
Unit getCumulativeRemainingLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining labor units for this spread period, which is cumulated from the remaining start to the end of this period.- Returns:
- the cumulated remaining labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingLateLaborUnits
Gets the remaining late labor units for this spread period.- Returns:
- the remaining late labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingLateLaborUnits
Unit getCumulativeRemainingLateLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining late labor units for this spread period, which is cumulated from the remaining late start to the late end of this period.- Returns:
- the cumulated remaining late labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingNonlaborUnits
Gets the remaining nonlabor units for this spread period.- Returns:
- the remaining nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingNonlaborUnits
Unit getCumulativeRemainingNonlaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining nonlabor units for this spread period, which is cumulated from the remaining start to the end of this period.- Returns:
- the cumulated remaining nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingLateNonlaborUnits
Gets the remaining late nonlabor units for this spread period.- Returns:
- the remaining late nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingLateNonlaborUnits
Unit getCumulativeRemainingLateNonlaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining late nonlabor units for this spread period, which is cumulated from the remaining late start to the late end of this period.- Returns:
- the cumulated remaining late nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getPlannedLaborUnits
Gets the planned labor units for this spread period.- Returns:
- the planned labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativePlannedLaborUnits
Unit getCumulativePlannedLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative planned labor units for this spread period, which is cumulated from the planned start to the end of this period.- Returns:
- the cumulated planned labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getPlannedNonlaborUnits
Gets the planned nonlabor units for this spread period.- Returns:
- the planned nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativePlannedNonlaborUnits
Unit getCumulativePlannedNonlaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative planned nonlabor units for this spread period, which is cumulated from the planned start to the end of this period.- Returns:
- the cumulated planned nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getActualExpenseCost
Gets the actual expense cost for this spread period.- Returns:
- the actual expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeActualExpenseCost
Cost getCumulativeActualExpenseCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative actual expense cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated actual expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getActualLaborCost
Gets the actual labor cost for this spread period.- Returns:
- the actual labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeActualLaborCost
Cost getCumulativeActualLaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative actual labor cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated actual labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getActualNonlaborCost
Gets the actual nonlabor cost for this spread period.- Returns:
- the actual nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeActualNonlaborCost
Cost getCumulativeActualNonlaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative actual nonlabor cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated actual nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getActualMaterialCost
Gets the actual material cost for this spread period.- Returns:
- the actual material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeActualMaterialCost
Cost getCumulativeActualMaterialCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative actual material cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated actual material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getActualTotalCost
Gets the actual total cost, including labor, nonlabor, and expense cost, for this spread period.- Returns:
- the actual total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeActualTotalCost
Cost getCumulativeActualTotalCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative actual total cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated actual total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getAtCompletionExpenseCost
Gets the at completion expense cost for this spread period.- Returns:
- the at completion expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeAtCompletionExpenseCost
Cost getCumulativeAtCompletionExpenseCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative at completion expense cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated at completion expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getAtCompletionLaborCost
Gets the at completion labor cost for this spread period.- Returns:
- the at completion labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeAtCompletionLaborCost
Cost getCumulativeAtCompletionLaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative at completion labor cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated at completion labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getAtCompletionNonlaborCost
Gets the at completion nonlabor cost for this spread period.- Returns:
- the at completion nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeAtCompletionNonlaborCost
Cost getCumulativeAtCompletionNonlaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative at completion nonlabor cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated at completion nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getAtCompletionMaterialCost
Gets the at completion material cost for this spread period.- Returns:
- the at completion material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeAtCompletionMaterialCost
Cost getCumulativeAtCompletionMaterialCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative at completion material cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated at completion material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getAtCompletionTotalCost
Gets the at completion total cost for this spread period.- Returns:
- the at completion total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeAtCompletionTotalCost
Cost getCumulativeAtCompletionTotalCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative at completion total cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated at completion total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getBaselinePlannedExpenseCost
Gets the baseline planned expense cost for this spread period.- Returns:
- the baseline planned expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeBaselinePlannedExpenseCost
Cost getCumulativeBaselinePlannedExpenseCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative baseline planned expense cost for this spread period, which is cumulated from the baseline planned start to the end of this period.- Returns:
- the cumulated baseline planned expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getBaselinePlannedLaborCost
Gets the baseline planned labor cost for this spread period.- Returns:
- the baseline planned labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeBaselinePlannedLaborCost
Cost getCumulativeBaselinePlannedLaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative baseline planned labor cost for this spread period, which is cumulated from the baseline planned start to the end of this period.- Returns:
- the cumulated baseline planned labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getBaselinePlannedNonlaborCost
Gets the baseline planned nonlabor cost for this spread period.- Returns:
- the baseline planned nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeBaselinePlannedNonlaborCost
Cost getCumulativeBaselinePlannedNonlaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative baseline planned nonlabor cost for this spread period, which is cumulated from the baseline planned start to the end of this period.- Returns:
- the cumulated baseline planned nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getBaselinePlannedMaterialCost
Gets the baseline planned material cost for this spread period.- Returns:
- the baseline planned material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeBaselinePlannedMaterialCost
Cost getCumulativeBaselinePlannedMaterialCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative baseline planned material cost for this spread period, which is cumulated from the baseline planned start to the end of this period.- Returns:
- the cumulated baseline planned material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getBaselinePlannedTotalCost
Gets the baseline planned total cost for this spread period.- Returns:
- the baseline planned total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeBaselinePlannedTotalCost
Cost getCumulativeBaselinePlannedTotalCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative baseline planned total cost for this spread period, which is cumulated from the baseline planned start to the end of this period.- Returns:
- the cumulated baseline planned total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingExpenseCost
Gets the remaining expense cost for this spread period.- Returns:
- the remaining expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingExpenseCost
Cost getCumulativeRemainingExpenseCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining expense cost for this spread period, which is cumulated from the remaining start to the end of this period.- Returns:
- the cumulated remaining expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingLateExpenseCost
Gets the remaining late expense cost for this spread period.- Returns:
- the remaining late expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingLateExpenseCost
Cost getCumulativeRemainingLateExpenseCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining late expense cost for this spread period, which is cumulated from the remaining late start to the late end of this period.- Returns:
- the cumulated remaining late expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingLaborCost
Gets the remaining labor cost for this spread period.- Returns:
- the remaining labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingLaborCost
Cost getCumulativeRemainingLaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining labor cost for this spread period, which is cumulated from the remaining start to the end of this period.- Returns:
- the cumulated remaining labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingLateLaborCost
Gets the remaining Late labor cost for this spread period.- Returns:
- the remaining Late labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingLateLaborCost
Cost getCumulativeRemainingLateLaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining late labor cost for this spread period, which is cumulated from the remaining late start to the late end of this period.- Returns:
- the cumulated remaining late labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingNonlaborCost
Gets the remaining nonlabor cost for this spread period.- Returns:
- the remaining nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingNonlaborCost
Cost getCumulativeRemainingNonlaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining nonlabor cost for this spread period, which is cumulated from the remaining start to the end of this period.- Returns:
- the cumulated remaining nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingLateNonlaborCost
Gets the remaining late nonlabor cost for this spread period.- Returns:
- the remaining late nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingLateNonlaborCost
Cost getCumulativeRemainingLateNonlaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining late nonlabor cost for this spread period, which is cumulated from the remaining late start to the late end of this period.- Returns:
- the cumulated remaining late nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingMaterialCost
Gets the remaining material cost for this spread period.- Returns:
- the remaining material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingMaterialCost
Cost getCumulativeRemainingMaterialCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining material cost for this spread period, which is cumulated from the remaining start to the end of this period.- Returns:
- the cumulated remaining material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingLateMaterialCost
Gets the remaining late material cost for this spread period.- Returns:
- the remaining late material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingLateMaterialCost
Cost getCumulativeRemainingLateMaterialCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining late material cost for this spread period, which is cumulated from the remaining late start to the late end of this period.- Returns:
- the cumulated remaining late material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingTotalCost
Gets the remaining total cost for this spread period.- Returns:
- the remaining total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingTotalCost
Cost getCumulativeRemainingTotalCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining total cost for this spread period, which is cumulated from the remaining start to the end of this period.- Returns:
- the cumulated remaining total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getRemainingLateTotalCost
Gets the remaining late total cost for this spread period.- Returns:
- the remaining late total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeRemainingLateTotalCost
Cost getCumulativeRemainingLateTotalCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative remaining late total cost for this spread period, which is cumulated from the remaining late start to the late end of this period.- Returns:
- the cumulated remaining late total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getPlannedExpenseCost
Gets the planned expense cost for this spread period.- Returns:
- the planned expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativePlannedExpenseCost
Cost getCumulativePlannedExpenseCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative planned expense cost for this spread period, which is cumulated from the planned start to the end of this period.- Returns:
- the cumulated planned expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getPlannedLaborCost
Gets the planned labor cost for this spread period.- Returns:
- the planned labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativePlannedLaborCost
Cost getCumulativePlannedLaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative planned labor cost for this spread period, which is cumulated from the planned start to the end of this period.- Returns:
- the cumulated planned labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getPlannedNonlaborCost
Gets the planned nonlabor cost for this spread period.- Returns:
- the planned nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativePlannedNonlaborCost
Cost getCumulativePlannedNonlaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative planned nonlabor cost for this spread period, which is cumulated from the planned start to the end of this period.- Returns:
- the cumulated planned nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getPlannedMaterialCost
Gets the planned material cost for this spread period.- Returns:
- the planned material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativePlannedMaterialCost
Cost getCumulativePlannedMaterialCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative planned material cost for this spread period, which is cumulated from the planned start to the end of this period.- Returns:
- the cumulated planned material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getPlannedTotalCost
Gets the planned total cost for this spread period.- Returns:
- the planned total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativePlannedTotalCost
Cost getCumulativePlannedTotalCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative planned total cost for this spread period, which is cumulated from the planned start to the end of this period.- Returns:
- the cumulated planned total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getActualCost
Gets the actual cost for this spread period.- Returns:
- the actual cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeActualCost
Cost getCumulativeActualCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative actual cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated actual cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getEarnedValueCost
Gets the earned value cost for this spread period.- Returns:
- the earned value cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeEarnedValueCost
Cost getCumulativeEarnedValueCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative earned value cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated earned value cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getEarnedValueLaborUnits
Gets the earned value labor units for this spread period.- Returns:
- the earned value labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeEarnedValueLaborUnits
Unit getCumulativeEarnedValueLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative earned value labor units for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated earned value labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getEstimateAtCompletionCost
Gets the estimate at completion cost for this spread period.- Returns:
- the estimate at completion cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeEstimateAtCompletionCost
Cost getCumulativeEstimateAtCompletionCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative estimate at completion cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated estimate at completion cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getEstimateAtCompletionLaborUnits
Gets the estimate at completion labor cost for this spread period.- Returns:
- the estimate at completion labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeEstimateAtCompletionLaborUnits
Unit getCumulativeEstimateAtCompletionLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative estimate at completion labor cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated estimate at completion labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getEstimateToCompleteCost
Gets the estimate to complete labor cost for this spread period.- Returns:
- the estimate to complete labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeEstimateToCompleteCost
Cost getCumulativeEstimateToCompleteCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative estimate to complete labor cost for this spread period, which is cumulated from the remaining start to the end of this period.- Returns:
- the cumulated estimate to complete labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getEstimateToCompleteLaborUnits
Gets the estimate to complete labor units for this spread period.- Returns:
- the estimate to complete labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativeEstimateToCompleteLaborUnits
Unit getCumulativeEstimateToCompleteLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative estimate to complete labor units for this spread period, which is cumulated from the remaining start to the end of this period.- Returns:
- the cumulated estimate to complete labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getPlannedValueCost
Gets the planned value cost for this spread period.- Returns:
- the planned value cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativePlannedValueCost
Cost getCumulativePlannedValueCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative planned value cost for this spread period, which is cumulated from the baseline planned start to the end of this period.- Returns:
- the cumulated planned value cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getPlannedValueLaborUnits
Gets the planned value labor units for this spread period.- Returns:
- the planned value labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativePlannedValueLaborUnits
Unit getCumulativePlannedValueLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative planned value labor units for this spread period, which is cumulated from the baseline planned start to the end of this period.- Returns:
- the cumulated planned value labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getPeriodActualLaborUnits
Gets the financial period actual labor units.- Returns:
- the financial period actual labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodActualLaborCost
Gets the financial period actual labor cost for this spread period.- Returns:
- the financial period actual labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodActualNonLaborUnits
Gets the financial period actual nonlabor units for this spread period.- Returns:
- the financial period actual nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodActualNonLaborCost
Gets the financial period actual nonlabor cost for this spread period.- Returns:
- the financial period actual nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodActualMaterialCost
Gets the financial period actual material cost for this spread period.- Returns:
- the financial period actual material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodActualExpenseCost
Gets the financial period actual expense cost for this spread period.- Returns:
- the financial period actual expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodAtCompletionLaborUnits
Gets the financial period at completion labor units for this spread period.- Returns:
- the financial period at completion labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodAtCompletionLaborCost
Gets the financial period at completion labor cost for this spread period.- Returns:
- the financial period at completion labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodAtCompletionNonLaborUnits
Gets the financial period at completion nonlabor units for this spread period.- Returns:
- the financial period at completion nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodAtCompletionNonLaborCost
Gets the financial period at completion nonlabor cost for this spread period.- Returns:
- the financial period at completion nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodAtCompletionMaterialCost
Gets the financial period at completion material cost for this spread period.- Returns:
- the financial period at completion material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodAtCompletionExpenseCost
Gets the financial period at completion expense cost for this spread period.- Returns:
- the financial period at completion expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodAtCompletionTotalCost
Gets the financial period at completion total cost for this spread period.- Returns:
- the financial period at completion total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodActualTotalCost
Gets the financial period actual total cost, including labor, nonlabor, and expense cost, for this spread period.- Returns:
- the financial period actual total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodEarnedValueCost
Gets the financial period earned value cost for this spread period.- Returns:
- the financial period earned value cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodEarnedValueLaborUnits
Gets the financial period earned value labor units for this spread period.- Returns:
- the financial period earned value labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodEstimateAtCompletionCost
Gets the financial period estimate at completion cost for this spread period.- Returns:
- the financial period estimate at completion cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodEstimateAtCompletionLaborUnits
Gets the financial period estimate at completion labor cost for this spread period.- Returns:
- the financial period estimate at completion labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodPlannedValueCost
Gets the financial period planned value cost for this spread period.- Returns:
- the financial period planned value cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getPeriodPlannedValueLaborUnits
Gets the financial period planned value labor units for this spread period.- Returns:
- the financial period planned value labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loaded
-
getCumulativePeriodActualLaborUnits
Unit getCumulativePeriodActualLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period actual labor units for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period actual labor units in hours.
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodActualLaborCost
Cost getCumulativePeriodActualLaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period actual labor cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period actual labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodActualNonLaborUnits
Unit getCumulativePeriodActualNonLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period actual nonlabor units for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period actual nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodActualNonLaborCost
Cost getCumulativePeriodActualNonLaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period actual nonlabor cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period actual nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodActualMaterialCost
Cost getCumulativePeriodActualMaterialCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period actual material cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period actual material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodActualExpenseCost
Cost getCumulativePeriodActualExpenseCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period actual expense cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period actual expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodAtCompletionLaborUnits
Unit getCumulativePeriodAtCompletionLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period at completion labor units for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period at completion labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodAtCompletionLaborCost
Cost getCumulativePeriodAtCompletionLaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period at completion labor cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period at completion labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodAtCompletionNonLaborUnits
Unit getCumulativePeriodAtCompletionNonLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period at completion nonlabor units for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period at completion nonlabor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodAtCompletionNonLaborCost
Cost getCumulativePeriodAtCompletionNonLaborCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period at completion nonlabor cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period at completion nonlabor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodAtCompletionMaterialCost
Cost getCumulativePeriodAtCompletionMaterialCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period at completion material cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period at completion material cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodAtCompletionExpenseCost
Cost getCumulativePeriodAtCompletionExpenseCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period at completion expense cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period at completion expense cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodAtCompletionTotalCost
Cost getCumulativePeriodAtCompletionTotalCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period at completion total cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period at completion total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodActualTotalCost
Cost getCumulativePeriodActualTotalCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period actual total cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period actual total cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodEarnedValueCost
Cost getCumulativePeriodEarnedValueCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period earned value cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period earned value cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodEarnedValueLaborUnits
Unit getCumulativePeriodEarnedValueLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period earned value labor units for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period earned value labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodEstimateAtCompletionCost
Cost getCumulativePeriodEstimateAtCompletionCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period estimate at completion cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period estimate at completion cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodEstimateAtCompletionLaborUnits
Unit getCumulativePeriodEstimateAtCompletionLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period estimate at completion labor cost for this spread period, which is cumulated from the actual start to the end of this period.- Returns:
- the cumulated financial period estimate at completion labor cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodPlannedValueCost
Cost getCumulativePeriodPlannedValueCost() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period planned value cost for this spread period, which is cumulated from the baseline planned start to the end of this period.- Returns:
- the cumulated financial period planned value cost in base currency units
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-
getCumulativePeriodPlannedValueLaborUnits
Unit getCumulativePeriodPlannedValueLaborUnits() throws SpreadFieldNotFoundException, SpreadCumulativeDataNotLoadedExceptionGets the cumulative financial period planned value labor units for this spread period, which is cumulated from the baseline planned start to the end of this period.- Returns:
- the cumulated financial period planned value labor units in hours
- Throws:
SpreadFieldNotFoundException- if this field was not loadedSpreadCumulativeDataNotLoadedException- if cumulative data was not loaded
-