9 Milestone Dates Tab

The Milestone Dates Tab allows you to enter the actual dates for study milestones.

9.1 How Payment Settings Affect the Milestone Dates Tab

The payment settings you selected on the payments sub-tab of the Settings Tab affect how dates are entered on the Milestone Dates Tab.

9.2 Entering Milestone Dates

The Milestone Dates Tab is used to enter actual dates for milestones that have been achieved during a specific time period.

To enter milestone dates:

  1. Navigate to the Milestone Dates Tab.

  2. Review the list of milestones. For any milestones that have been achieved during this period, enter the date the milestone was met by typing the date in the box or by clicking the calendar icon to select a date.

  3. The expected milestone date is provided for reference and comes from the plan currently designated as the Baseline Plan for the study you are tracking.

  4. Enter all dates as necessary and click Save. The far right column displays the variance between the expected and actual dates.