Skip Headers
StorageTek Virtual Storage Manager System VSM 6 Planning Guide
Release 6.0.7
E24924-10
Index
Next
Contents
List of Figures
List of Tables
Title and Copyright Information
Preface
Documentation Accessibility
Other VSM 6 Documents
1
Introduction
1.1
The VSM Solution
1.2
The VSM 6 Platform
2
VSM 6 Planning and Implementation Overview
2.1
Planning Goals
2.2
Creating Planning Teams
2.3
Planning Activities
2.4
Planning Spreadsheet
3
VSM 6 Implementation Planning
3.1
Implementation Planning Goals
3.2
Implementation Planning Process Overview
3.2.1
Key High-Level Activities
3.2.2
Key Sub-Tasks
3.2.3
Key Participants
3.3
Satisfying Network Infrastructure Requirements
3.4
Satisfying MVS Host Software Requirements
3.5
Satisfying Serviceability Requirements
4
VSM 6 Hardware Configuration Planning
4.1
VSM 6 Configuration Options
4.1.1
VSM 6 Base Configuration
4.1.2
Storage Capacity Upgrade
4.1.2.1
Capacity Upgrade for VSM 6 with Oracle DE2-24C Disk Shelves
4.1.2.2
Capacity Upgrade for VSM 6 with Sun J4410 Disk Shelves
4.1.3
FICON Upgrade
4.2
Configuration Planning Overview
4.2.1
Key High-Level Activities
4.2.2
Key Sub-Tasks
4.2.3
Key Participants
5
VSM 6 Physical Site Readiness Planning
5.1
The Site Readiness Planning Process
5.1.1
Key High-Level Activities
5.1.2
Key Sub-Tasks
5.1.3
Key Participants
5.2
Site Evaluation – External Considerations
5.3
Site Evaluation – Internal Considerations
5.4
Transferring Equipment Point-to-Point
5.4.1
Structural Dimensions and Obstructions
5.4.2
Elevator Lifting Capacities
5.4.3
Floor-Load Ratings
5.4.4
Ramp Inclines
5.5
Data Center Safety
5.5.1
Emergency Power Control
5.5.2
Fire Prevention
5.6
Site Power Distribution Systems
5.6.1
Equipment Grounding
5.6.2
Source Power Input
5.6.3
Dual Independent Source Power Supplies
5.6.4
Transient Electrical Noise and Power Line Disturbances
5.6.5
Electrostatic Discharge
5.7
HVAC Requirements
5.8
Environmental Requirements and Hazards
5.9
Floor Construction Requirements
5.9.1
Floor Loading Requirements
5.9.2
Floor Loading Specifications and References
5.9.3
Raised-Floor Lateral Stability Ratings
5.9.4
Raised-Floor Panel Ratings
5.9.5
Raised-Floor Pedestal Ratings
5.10
VSM 6 Environmental Specifications
5.10.1
VSM 6 Base Configuration
5.10.2
VSM 6 Capacity
5.10.3
VSM 6 Overall Dimensions
5.10.4
VSM 6 Service Clearance
5.10.5
VSM 6 Weight
5.10.6
VSM 6 Power
5.10.7
VSM 6 HVAC
6
VSM 6 Ethernet (IP) Data Path Connectivity
6.1
VSM 6 Ethernet (IP) Port Assignments
6.2
Network Port Scenarios
6.2.1
Node Configuration Example
6.2.2
Direct, Switched, and Gateway Configuration Scenarios
6.3
VSM 6 Ethernet (IP) Connectivity Considerations
6.4
VSM 6 IP Connectivity Examples
6.4.1
VSM 6 IP Replication: Define the Replication Ports
6.4.1.1
VSM 6 CLI Example:
6.4.2
VSM 6 VLE Connectivity: Define the IPPATH
6.4.2.1
VSM 6 CLI Example:
6.4.2.2
VTCS Example:
6.4.3
VSM 6 CLINK Connectivity: Define the IPPATH
6.4.3.1
VSM 6 CLI Example:
6.4.3.2
VTCS Example:
7
VSM 6 FICON Data Path Connectivity
7.1
How it Works
7.2
VSM 6 FICON Port Assignments
7.3
VSM 6 RTD Connectivity Examples
7.4
VSM 6 RTD Connectivity: Direct Connection
7.4.1
VSM 6 CLI Example:
7.4.2
VTCS Example:
7.5
VSM 6 RTD Connectivity: Single Switch
7.5.1
VSM 6 CLI Example:
7.5.2
VTCS Example:
7.6
VSM 6 RTD Connectivity: Cascaded Switch
7.6.1
VSM 6 CLI Example:
7.6.2
VTCS Example:
7.7
VSM 6 RTD Connectivity: Dual RTDs
7.7.1
VSM 6 CLI Example:
7.7.2
VTCS Example:
7.8
VSM 6 RTD Connectivity: Four RTDs One Port
7.8.1
VSM 6 CLI Example:
7.8.2
VTCS Example:
7.9
VSM 6 RTD Connectivity: Dual-Path RTD
7.9.1
VSM 6 CLI Example 1:
7.9.2
VTCS Example 1:
7.9.3
VSM 6 CLI Example 2:
7.9.4
VTCS Example 2:
7.10
VSM 6 RTD Connectivity: Dual-Path Dual RTD
7.10.1
VSM 6 CLI Example:
7.10.2
VTCS Example:
7.11
VSM 6 RTD Connectivity: Multi-Path Dual RTD
7.11.1
VSM 6 CLI Example:
7.11.2
VTCS Example:
A
Controlling Contaminants
A.1
Environmental Contaminants
A.2
Required Air Quality Levels
A.3
Contaminant Properties and Sources
A.3.1
Operator Activity
A.3.2
Hardware Movement
A.3.3
Outside Air
A.3.4
Stored Items
A.3.5
Outside Influences
A.3.6
Cleaning Activity
A.4
Contaminant Effects
A.4.1
Physical Interference
A.4.2
Corrosive Failure
A.4.3
Shorts
A.4.4
Thermal Failure
A.5
Room Conditions
A.6
Exposure Points
A.7
Filtration
A.8
Positive Pressurization and Ventilation
A.9
Cleaning Procedures and Equipment
A.9.1
Daily Tasks
A.9.2
Weekly Tasks
A.9.3
Quarterly Tasks
A.9.4
Biennial Tasks
A.10
Activity and Processes
Index