Requirement Overview

Requirements can be attached to an activity to set conditions around when the activity may process.  When an activity with requirements is attached to a policy and processed, but the conditions are not met, then a requirement icon requirement icon will appear next to that activity on the Activity screen.  Clicking the requirement icon will bring up the Requirement screen, where the options for managing the requirement can be accessed.

 

Requirement Window

When the Requirement window opens, a description of the requirement is given, along with several options for managing the requirement.  Right-clicking on the requirement will reveal the Requirement right-click options.

Satisfying Requirements

When an activity appears on the Activity screen with a requirement icon, there are two methods for handling that requirement. Click the requirement icon  to open the Requirement window. The requirement description will be listed along with several date fields and a Waived checkbox.

 

Note:  The activity will only process once all requirements are met.  The effective date of the requirement will be the latest date on the collective requirements for a given activity or the date specified in the configuration of the DeliveryRequirements business rule.

 

Waived Checkbox: If this box is checked, then the Close Date field will be automatically populated with the system date. The requirement will be closed. If the activity is processed, a new requirement will be added to the requirement screen and the original requirement that was waived will be greyed out and listed at the top. The activity will not process until the requirement is satisfied.

 

Close Date: When a date is entered in this field, then the requirement will be satisfied. Click the lightning bolt icon and the activity will change from Requirements Pending status to Pending status. Then click the lightning bolt icon again to process the activity. It should change to Active status.

 

Activities will retain the requirement icon even after the requirements have been satisfied and the activity successfully processes. 

 

Requirement window in OIPA

Requirement Window in OIPA