Withholding information can also be configured at the activity level. You can set an activity's withholding details to process according to policy level withholding or activity level withholding.
After you select the activity from the Activity drop down list, click the Withholding tab. Select the withholding type from the drop down box. You can choose Activity or Policy level withholding. When the activity is processed it will use the withholding level indicated.
You can change the withholding level on an activity if it is still in pending status. To do this, you will click the Activity Details icon to the right of the activity. When the Activity Details window opens, click the withholding link and select the withholding level from the Withholding type drop down box. You can update any other withholding details. Make sure to click OK to save the changes.