AAIs
See automatic accounting instructions
automatic accounting instructions
FMA, FMB, FMF, FMG, FMH, and AT00
FMC, FMD, FME, FMI, FMJ, and FMK
setting up for equipment billing
CAM,
See capital asset management
CBM
See condition-based maintenance
component change-out
See parent and component relationships
CRP
See capacity requirements planning
EPL
See equipment parts list
adding master extension records
creating a preventive maintenance schedule
creating master records manually
creating messages from role-based workspaces
creating records from fixed assets
entering specification information
entering time billing information
searching for records from role-based workspaces
setting up billing
See Also equipment billing
viewing detail information from role-based workspaces
viewing PM backlog from role-based workspaces
viewing specification data from role-based workspaces
automatic accounting instructions
setting up resolutions by code
family and model combinations
See product family and model combinations
IGS
See intelligent graphic solution
entering additional system information
entering item branch information
reviewing capacity load by period summary
reviewing capacity load by work center
reviewing messages by dispatch group
reviewing messages by work center
revising resource units for a work center
setting up critical work centers
issuing miscellaneous parts to work orders
reviewing costs by parent work order
reviewing estimated and actual work order amounts
reviewing summarized work order costs
setting up general information
MBF
See time entry master business function
entering for a piece of equipment
overview of meter estimates
See Also meter estimates
model and family combinations
See product family and model combinations
MRP,
See material requirements planning
integration with maintenance planning
issuing miscellaneous parts to work orders
reviewing parent information for component parts
PM,
See preventive maintenance
portal
See role-based workspaces
automatic accounting instructions
creating schedules for multiple pieces of equipment
running the PM Projection Batch Update
setting up maintenance rules
See Also maintenance rules
setting up rules for schedules
setting up schedule information
setting up standard procedures
setting up threshold percentages
typical maintenance cycle chart
purchase orders - viewing related from role-based workspaces
work orders
See Also work order life cycle
assigning parts from inventory
automatic accounting instructions
creating for unscheduled maintenance
creating using Work Order Entry (P48201 and P17714)
creating with planning workbench
printing from role-based workspaces
reviewing costs by category code
reviewing costs by parent order
reviewing estimated and actual amounts
setting up for unscheduled maintenance
setting up standard instructions
setting up standard parts list
updating life cycle information
updating status based on purchase orders
viewing detail information from role-based workspaces