In this task you add the Review Report activity, an interactive activity used by
participants in the Supervisor role.
To add the Review Report interactive activity:
-
Click on the interactive activity icon
(
) in the editor toolbar, and insert the interactive activity in the
Supervisor swimlane, and to the right of the Check Company Policy activity.
The
Activity dialog box appears.
-
In the Name field, enter Review Report, and
click OK.
The Review Report interactive activity is added to the
process.
-
Click on the transition between the Check Company Policy activity and the End activity.
The transition is highlighted with a round grip at each
end.
-
Click and drag the right side of the transition (the arrowhead side), so that it goes to
the Review Report activity.
The End activity is now disconnected, so if you save the
process at this point some errors will appear in the
Problems window, which is below the design
editor.
-
To reconnect the End activity, click on Add Transition
(
), in the Flow section of the toolbar, then click
on the Review Report activity and then finally on the End activity.
The End activity is once again connected to the process. If
there are errors in the Problems window, save the process. The errors should
disappear within a few moments.
-
Move the End activity, by clicking and dragging, down to the Supervisor swimlane. It
should be to the right of the Review Report activity (see the diagram below).
Note: It is usually good practice to indicate forward progress in the process by flowing from
left to right. Avoid backward flows in the happy path.
After completing this task, your process design diagram should look like this:
Figure 1. Process with Review Report activity.
Save your changes before proceeding to the next task.