| Parameter | Description |
|---|---|
| Start Time | Defines the start time for the simulation. This time is used only for logging. It is not used for scheduling purposes. |
| Duration | Defines the period the simulation will run. This interval is specified in months, days, hours, minutes, and seconds. |
| Use Calendar Rule | Determines if calendar rules are used in simulation. Checking this box allows the simulation to account for calendar rules when determining participant allocations. |
Project Simulation Models also contain the following tabs which allow you to further define your simulation.
The Project Tab contains a table that lists all of the processes within the current project. For each process, you can select which process simulation model you want to use for each process. Also, you must specify which processes to include in the simulation.
For all of the included processes, instances are generated when the simulation is run.
| Icon | Description |
|---|---|
| Loads resources from the organization into the project simulation model. | |
| Adds a new resource to the project simulation model. | |
| Deletes the currently selected resource from the project simulation model. |
The Priority Tab allows you to specify the probability for priority distribution of an instance. This priority determines the way an instance flows within a process. The sum of all priority distributions must equal 100.