Adding a Due Transition

You can a due transitions directly from the activity context menu in the process design editor.

To add a due transition:

  1. In the process design editor, right-click on the activity from which the transition will flow, and click Add due transition (Due Transition icon
				).
  2. Click on the activity the transition will flow to. Note that as you move the mouse, the transition line is shown. The Transition dialog box appears.
  3. In the Name field, enter a name for the new transition.
  4. Switch to the Properties page of the Transition dialog box.
  5. Select an expression type, which can be Schedule Based, an Interval Expression, or an Interval Constant.
  6. Enter the data required and click OK.

The due transition is added to the process diagram.